- What should the quote say about island delivery?
- It should identify the destination, included transport stages, receiving responsibility and confirmed timing. Do not infer port handling, inland transfer or local setup labor from the unit's list price.
- Which configuration fits a renovation in an occupied building?
- Count the people who will lose access to building restrooms at the busiest moment of the closure. Compartment count alone is not a capacity rating: compare the 2-Stall and 4-Stall against your expected peak use; the Wheelchair Accessible + 2-Stall adds a ramped accessible suite where the public or staff need one. Showers are usually unnecessary, so ask about a restroom-only unit if no one will shower.
- What should I plan for with year-round heat and humidity?
- Continuous A/C while occupied, a drained and shaded pad, and power sized for the exact unit’s climate equipment. Humid air and frequent use also make cleaning and ventilation part of the service schedule, not an afterthought.
- How should a shutdown or multi-shift site size the trailer?
- Count users in the busiest shift-change window, including contractors. More compartments clear that peak; showers make sense for long or dirty shifts. Confirm that the pump truck and potable refill can reach the pad on a schedule that does not collide with equipment moves.
- How do I measure the space the trailer needs?
- Measure the deployed footprint, not just the trailer body: the body and towbar, the steps and landings at every door, the ramp and its landing for the wheelchair-accessible configuration (the provided ramp is about 16 ft at a 1:12 slope), clearance for doors to open, and a lane for the pump truck to reach the service connections. Confirm exact dimensions for the unit you choose on the quote.
- What if the site has no suitable outlet or water connection?
- Each unit needs a standard grounded three-prong plug on a dedicated 20-amp circuit; where none exists, a generator works. A quiet inverter generator providing at least 4,000 running watts and 5,000 starting watts is our recommended baseline for the 2-stall, 4-stall and 2-stall plus wheelchair-accessible configurations. Water comes from the onboard tank filled from a potable source or from a potable hose. Arrange potable refills and waste pumping with a local provider before delivery; All Pro does not operate a service network outside Southwest Florida.
- Who confirms placement requirements for a Honolulu parcel?
- The office that controls the parcel, which is not always the one on the mailing address. Vehicle title and registration offices do not approve where a trailer sits. Start with the placement authority described on this page and the property owner or operator, and ask about trailer placement, generator use, the accessible route and waste servicing for your actual site and duration.
- Can I rent instead of buying?
- Not here. Our rental fleet serves Southwest Florida only; elsewhere All Pro sells trailers with delivery quoted by ZIP.